test content
What is the Arc Client?
Install Arc

Nukara Rep Consumable Projects Still Require Doffs

spencerb96spencerb96 Member Posts: 243 Media Corps
Howdy, a while back there was a patch that removed Doff requirements from Rep projects and replaced them with extra Dil requirements.

However, the following projects still have a Doff requirement.
  • All versions of "Reprogrammed Tholian Drones"
  • Nukara Web Breaker
ffluoti63bi9.png
Sign In or Register to comment.